What Others are Saying

Bank of the West

“We wanted a dramatic building where quality is built into every aspect. The quality of construction is excellent and has received nothing but praise from those involved in the project and from public onlookers, as well.”

Angelo G. Tsakopoulos
Managing Partner

Sidney Kimmel Cancer Center

“Through this building, your organization can be proud that the road to the cure to cancer has become ever shorter.”

Albert Deisseroth, M.D., Ph.D.
US Food and Drug Administration
Sidney Kimmel Cancer Center

SASCO, Electrical Contractors and Consultants to the Construction Industry

“Rudolph and Sletten’s work ethics are one of the highest in the industry. Construction supervision, scheduling, coordination of disciplines, safety on the job, etc. are priorities on their constructions sites.”

Jerry D. Jordan
Director of Regional Sales/Director of Estimating and Engineering
SASCO

Sierra College Tahoe Truckee Campus

“Rudolph and Sletten did an excellent job of coordinating with all agencies, keeping the local traffic moving, and getting the work done on schedule.”

Rob Koster
Project Manager
Sierra College

Letter of Recommendation

"Rudolph and Sletten has the expertise and personnel to manage this process."

Joseph Cvetas
Regional President
Southland Industries

Jay Paul, Moffett Towers

"The Rudolph & Sletten construction teams that I worked with at Moffett Towers for the warm shell work at 1120 Enterprise and the tenant improvements at 1140 and 1160 Enterprise were professional and thorough in the execution and quality of their work. Their direct knowledge of the buildings and their operating systems were an important asset that made the work go smoothly and without issue. R&S was able to effectively address both the Owner’s and Tenant’s needs and requirements, while successfully meeting aggressive schedules and budgets."

Dan Ortiz
Project Manager
Jay Paul Company

 

 

Altera Corporation HQ

“We have been very impressed with Rudolph and Sletten’s command of sequencing, logistics, and management of our projects.”

Robert Wingo
Director of Real Estate & Facilities
Altera Corporation

UCSF CVRB Mission Bay

“Since I became responsible for UCSF’s project delivery processes in 2004, I’ve been looking for ways to use cutting edge tools and processes to improve that situation and allow projects to benefit from improved information flow and management process.”

Michael Bade
(interim) Assistant Vice Chancellor, Capital Programs and Campus Architect
UCSF CVRB Mission Bay

Red Hawk Casino

“With a fast paced schedule, I am aware that Rudolph and Sletten completed the project within budget and ahead of schedule, all the while dealing with a significant amount of design changes.”

Brian Marquette
Cunningham Group Architecture, P.A.

California State Polytechnic University, Pomona

“During the construction of the project they demonstrated their impressive ability to safely maneuver around students and faculty, who were utilizing the same space, while staying on course with great attention to detail and schedule.”

Leatha J. Elsdon
Senior Project Manager
Facilities, Planning, Design and Construction California State Polytechnic University, Pomona

Red Hawk Casino

“I found each of the team members to be effective communicators who were able to work cooperatively and efficiently as the owner’s liaison amongst all of the many very capable contractors who also worked on our project.”

Scott Holmes
Chairman
Shingle Springs Tribal Gaming Authority

Dry Creek Rancheria,
Band of Pomo Indians

“It was truly a breath of fresh air from some of our experiences with past contractors on the project. Your staff members, led by Robert Stokes, were enthusiastic, team-oriented and willing to do what it took to get the job done.”

Brian E. Kasen,
President/CEO
BEK Construction Management Group, Inc.

Lean Enterprise

"Rudolph and Sletten’s commitment to integrating the lean principles and tools is setting an industry standard."

M.C. Brady
Director, Professional Development
San Diego State College of Extended Studies

Altera Corporation HQ

“I can highly recommend Rudolph and Sletten as a contractor where performance, efficiency and enthusiasm are standards of business.”

Robert Wingo
Director of Real Estate & Facilities
Altera Corporation

John Muir Health

“Work like this doesn’t just happen and one person or one company cannot make an operation like this successful. This is great example of success through team work and planning.”

Michael Monaldo, AIA
Vice President, Facilities Development
John Muir Health

Red Hawk Casino

“I feel that Rudolph and Sletten’s attention to detail throughout the construction process and professionalism with the RFI & Submittal process was another strong attribute of the firm.”

Brian Marquette
Cunningham Group Architecture, P.A.

Moffett Towers

“With their innovative approaches to building, commitment to quality and expertise, Rudolph and Sletten will be an excellent selection for your project.”

Janette R. Sammartino
Sr. Vice President/COO
Jay Paul Company

Red Hawk Casino

“I have worked with many contractors in the past and believe that Rudolph and Sletten has been one of the easiest to work with.”

Dennis A. Beaudrie
Senior Project Director
Cumming Corporation

UCSF CVRB Mission Bay

“As you know, it is critical and essential that contractors behave consistently and reliably, and meet the University's scheduling, scoping, and quality requirements. We can say without hesitation that Rudolph and Sletten succeeds on all counts."

Sandra Beck, AIA, LEED AP
Associate Director, Capital Programs
University of California San Francisco

Red Hawk Casino

“I can say that all parties were duly impressed with the caliber of people who staffed the project and their willingness to do whatever was required to get the job done.”

Stephen E. DeWulf, C.P.E.
Vice President – Operations
Cummings Corporation

Oceanside School District

“We have admired the professionalism of Rudolph and Sletten, their ability to create a great project management team and for providing experienced superintendents that are custom tailored for each job.”

Ken Ringer
Vice President
Casper Company

Dry Creek Rancheria, Band of Pomo Indians

“Rudolph and Sletten was able to step-in and seamlessly integrate several long standing design-build subcontractors into their procurement methods. Their diligence and creativity in helping me de-scope the project and of course, the constant need to control cost was refreshing.”

Eugene Dvorak, AIA
Director of Project Development
Dry Creek Rancheria Band of Pomo Indians

North Tahoe Middle and High School Reconstruction Project

“The entire Rudolph and Sletten team has demonstrated their willingness to do what it takes to make our projects successful.”

Anna Klovastad
Project Manager
Tahoe Truckee Unified School District

CHLA Facilities

“Just another example of great team work and flawless execution.”

Rod Hanners
SVP & COO, CHLA

Dry Creek Rancheria,
Band of Pomo Indians

“Rudolph and Sletten hit the ground running with their onsite-presence and corporate estimating efforts.”

Brian E. Kasen
President/CEO
BEK Construction Management Group, Inc.

Oceanside School District

“The clear professionalism in negotiating our contract made the process smooth.”

Ken Ringer
Vice President
Casper Company

Crocker Art Museum

“Jon and his estimation team have been thorough in working through subcontractors and scope to provide the onsite personnel with qualified teams able to man the job properly.”

Randy Boehm
Urban Resources, Inc.
Crocker Art Museum Owner’s Representative

Cuyamaca College Student Center

“We appreciate the care and concern Rudolph and Sletten, Inc. took to assure the District realized the quality building and project.”

James Raver
LEED AP
LPA Associates

North Tahoe Middle and High School Reconstruction Project

“Over a year after the final payment was made, Rudolph and Sletten continues to provide support for this project. Their dedication to customer satisfaction is truly exceptional.”

Anna Klovastad
Project Manager
Tahoe Truckee Unified School District

Dry Creek Rancheria, Band of Pomo Indians

“I have found Rudolph and Sletten to be a very straight forward, ethical and honest company, with a very high level of technical ability and cutting edge approach to analyzing site logistics, managing subcontractors, and carrying out construction.”

Eugene Dvorak, AIA
Director of Project Development
Dry Creek Rancheria Band of Pomo Indians

Red Hawk Casino

“We felt that we always had a “teammate” in Rudolph and Sletten that helped us work through all the situations that arise on a project of this size, and collectively come up with the best solutions for our client.”

Ken Rhyne
Director of Special Projects
Baker Barrios Architects, Interior Design

John Muir Health

"The use of BIM has significantly improved coordination of building systems and essentially eliminated coordination problems in the field."

Michael Monaldo, AIA
Vice President Facilities Development and Corporate Real Estate
John Muir Health

Altera Corporation HQ

“Rudolph and Sletten, Inc. consistently worked successfully with us on the areas budget constraints and their creativity resulted in no loss in quality of construction or visual appearance.”

Robert Wingo
Director of Real Estate & Facilities
Altera Corporation

Red Hawk Casino

“We have been extremely impressed by the effort Rudolph and Sletten has put into this project from our initial pricing and negotiation meetings through to the clean up and completion of punch list items.”

Richard C. Bienapfl
Vice President,
Development and Construction
Lakes Entertainment, Inc.

California State Polytechnic University, Pomona

“Rudolph and Sletten has been the most professional and service-oriented construction company I have worked with."

Leatha J. Elsdon
Senior Project Manager
Facilities, Planning, Design and Construction California State Polytechnic University, Pomona

Red Hawk Casino

“We certainly look forward to working with Rudolph and Sletten again and would be most happy to recommend you to anyone looking for a first class contractor.”

Ken Rhyne
Director of Special Projects
Baker Barrios Architects

Hitachi; Global Storage Technologies

“In the midst of project pressures and resource constraints, it is often easier to merely meet minimum standards; therefore, I want to thank Rudolph and Sletten for the dedication and determination that allowed us to exceed our goals.”

David Koury
Program Manager
Real Estate & Site Operations
Hitachi; Global Storage Technologies

Bank of the West Tower

“My father and I set out to build the best privately-owned high rise office building in Sacramento, and Rudolph and Sletten’s experience and skill has made it possible for us to do that. I wholeheartedly recommend them for any project as they are truly a credit to the construction industry.“

Angelo G. Tsakopoulos, Esq.
Bank of the West Tower

California Theatre

“The Rudolph and Sletten team has provided excellent service to the San Jose Redevelopment Agency. They have been very professional and thorough, and are extremely knowledgeable.”

Bob Ruff
Program Director
San Jose Redevelopment Agency

John Muir Health

“Please congratulate the entire team for such a well executed operation, including your staff, subcontractors, suppliers, etc. I want to also thank you and Jtec for coordinating so closely with hospital operations and City staff. The impact of the concrete pour was minimal on operations and traffic flow.”

Michael Monaldo, AIA
Vice President, Facilities Development
John Muir Health

Jay Paul, Moffett Towers

"I definitely have to commend the R&S project team on their diligence and commitment in delivering our project. The schedule was very demanding and the phased delivery of the design documents and the many design changes that evolved only compounded the challenge. The project team remained very accommodating to our ever changing needs and processes while never losing focus on cost controls nor the final delivery dates as they worked through all of this with us."

 

Brian C. Cloepfil, AIA                Project Manager                           HP Global Real Estate

 

 

Red Hawk Casino

“We were very happy with the knowledge and dedication Rudolph and Sletten’s project engineers brought to the table. They were always there to help and try to ensure that our designs were carried to fruition.”

Ken Rhyne
Director of Special Projects
Baker Barrios Architects

Crocker Art Museum

“John Home, project manager and Bruce Beever, project superintendent have the project on schedule despite a winter with 24 rain days and despite the problems encountered with buried tanks and leaded soils.”

Randy Boehm
Urban Resources, Inc.
Crocker Art Museum Owner’s Representative

Bank of the West Tower

“We have been very impressed with their knowledge in project estimating, scheduling, construction document review and construction, even lending me a valuable hand in providing information that helped us secure a law firm tenant for 65,000 square feet.”

Angelo G. Tsakopoulos, Esq.
Bank of the West Tower

Crocker Art Museum

“Rudolph and Sletten always brings a can-do attitude to problem solving and are always cognizant of our budget and schedule.”

Randy Boehm
Urban Resources, Inc.
Crocker Art Museum Owner’s Representative

Red Hawk Casino

“Their preconstruction team was most thorough in their preparation of the GMP proposal and the negotiation to arrive at the GMP contract was most professional.”

Stephen E. DeWulf, C.P.E.
Vice President – Operations
Cummings Corporation

Sidney Kimmel Cancer Center

“The coordination of all the subcontractors and systems of the building was a virtuoso performance.”

Albert Deisseroth, M.D., Ph.D.
US Food and Drug Administration
Sidney Kimmel Cancer Center

Bank of the West Tower

“The quality of the construction is excellent and has received nothing but praise from those involved in the project and from public onlookers as well.”

Angelo G. Tsakopoulos, Esq.
Bank of the West Tower

Crocker Art Museum

“Weekly meetings, phone calls, RFI’s, Submittals, issues with the city --- all are addressed in a timely and clear manner including helping with priority issues for the architect and his consultants that keep everything tracking on time.”

Randy Boehm
Urban Resources, Inc.
Crocker Art Museum Owner’s Representative

Dry Creek Rancheria,
Band of Pomo Indians

“Rudolph and Sletten’s team proved to be flexible, professional, honest, and transparent when addressing the needs of the Tribe and their projects.”

Brian E. Kasen
President/CEO
BEK Construction Management Group, Inc.

Moffett Towers

“I have had the pleasure of working with Rudolph and Sletten, Inc. on numerous projects during our firm’s nearly 30 year relationship, like Moffett Towers and Pacific Shores Center. Rudolph and Sletten’s performance in the management of the project budget and scheduled through preconstruction and construction has been exceptional.”

Janette R. Sammartino
Sr. Vice President/COO
Jay Paul Company

Lean Enterprise

"Their dedication and zeal for lean thinking has put the company on a path to enable sustainability. With the support of Rudolph and Sletten’s leadership, the integration of Lean Enterprise has given the company a competitive edge."

M.C. Brady
Director, Professional Development
San Diego State College of Extended Studies

Jay Paul, Moffett Towers

"The Rudolph and Sletten team was a key factor in ensuring that this project was delivered for the client on time – we had numerous challenges, including a very lengthy permit process, continued design changes, and an aggressive delivery schedule that could not change.  The team orchestrated the construction delivery process around the controlled chaos of the permitting and design process to ensure that the schedule wasn’t compromised.  Rudolph and Sletten’s relationships with key City personnel, the Landlord, and their subcontractors were key to making this project a success."

 

Bernard Baker
Vice President
Project Management Advisors, Inc.

 

 

Newsletter Signup

image

Hooked on Construction, our company magazine, gives an in-depth look at projects, new innovations, and the people at Rudolph and Sletten.

Sign up to receive Hooked on Construction via email.

New Project Alerts

image

If you would like to receive an email alert when new projects are added or completed, please click here.

We will treat your email with the utmost respect. Rudolph and Sletten will not send you spam nor will we give your email address to a third party. You may opt out of this email list at any time by emailing this address: optout@rsconst.com

Awards & Recognitions

Over the years, Rudolph and Sletten and the projects we've built have been honored numerous times. Whether it's for safety or project innovation, we appreciate each and every award. After all, everyone likes to be acknowledged for their hard work. But ultimately we look to our clients for the highest measure of success — returning with new projects. Below is a list of awards, they each recognize the hard work and dedication of the architects, the developers and owners, the subcontractors and, of course, every Rudolph and Sletten employee.

 

2013

#7 Top Contractor: ENR California

#7 Top General Contracting Companies in the US: Modern Healthcare Magazine

#3 Commercial General Contractor: North Bay Business Journal

#4 Largest Commercial Contractor in the Bay Area: San Francisco Business Times

#5 Commercial Contractor: Silicon Valley by Silicon Valley Business Journal.

#6 General Contractor: San Diego Daily Transcript

Kaiser San Leandro Medical Center ranked 5th Largest Hospital Project in the Bay Area from the San Francisco Business Times.

Kaiser San Leandro Medical Center ranked 6th Largest Construction Project in the Bay Area from the San Francisco Business Journal.

Kaiser Redwood City Hospital & CUP ranked 7th Largest Construction Project in the Bay Area from the San Francisco Business Times.

Kaiser Redwood City Hospital & CUP ranked 8th Largest Hospital Project in the Bay Area from the San Francisco Business Times.

Kaiser Redwood City Hospital & CUP ranked 2nd Largest Construction Project on the Peninsula from the San Francisco Business Times.

#3 ENR Top Project Starts - Graton Resort and Casino

Sharp Rees-Stealy Medical Center wins DBIA's 2013 "Merit" Award.

Sharp Rees-Stealy Medical Center Awarded Merit of Honors in the commercial projects category from PCBC's Gold Nugget Awards.

UC Berkeley Energy Biosciences Building wins Honor Award in "Heal" Category: International Interior Design Association

UC Berkeley Energy Biosciences Building ranked 27th Largest Construction Project in the Bay Area from the San Francisco Business Times.

The Grossmont-Cuyamaca Community College District's Student Administration and Griffin Student Center Project wins San Diego Business Journal's Deal of the Year award.

 

2012

Ranked #11 Top General Contractor by ENR California. 

Ranked #3 Top General Contractor in San Diego County by The Daily Transcript.

Ranked #10 in the Top Ten General Contracting Companies in the US by Modern Healthcare Magazine.

Ranked #6 Top Healthcare Contractors in California by ENR California.

UCSF, Smith Cardiovascular Research Building awarded Best Higher Education/Research Project by ENR California.

HP Moffett Towers Lot 1 ranked 21st  in LEED Certified Spaces by the Silicon Valley Business Journal.

HP Moffett Towers Building F&G Interiors ranked 48th in ENR California's Top Project Starts.

Sacramento Greyhound Station awarded Best Community Impact in Sacramento's Real Estate Projects of the Year.

Gilead Sciences Laboratory Building ranked 45th in ENR California's Top Project Starts.

Kaiser San Leandro Support Building ranked 42nd in ENR California's Top Project Starts.

San Bernardino Courthouse ranked 21st in ENR California's Top Project Starts.

Helios Energy Bioscience Building was awarded the Best Practice Award at the California Higher Education Sustainability Conference.

Children's Hospital Los Angeles was awarded Best Medical Project at the Los Angeles Business Journal Commercial Real Estate Awards. 

The Grossmont-Cuyamaca Community College District's Student Administration and Griffin Student Center Project received an Achievement Award from the San Diego chapter of the Construction Management Association of America.

 

 

2011

DBIA awarded Solyndra Building 3 - Best Project in the category of rehabilitation/renovation.

Ranked #3 Top Commercial Contractor in Silicon Valley/ San Jose Business Journal.

Sacramento Business Journal ranks Rudolph and Sletten as #5 in its List of Top CM Firms.

At California Higher Education Sustainability Conference, San Diego Community College Career Technology Center project was awarded Best Practice for Sustainable Design.
 

2010

Named the Largest Biotech Contractor in the Bay Area by San Francisco Business Journal. Rudolph and Sletten recieved the recognition in part for their work on the UCSF Smith Cardiovascular Reasearch Building

Best of 2010 Award of Merit in Healthcare awarded to El Camino Hospital by McGraw Hill Publishing and California Construction Magazine.

Rudolph and Sletten project, University of San Diego’s Student Life Pavilion, were awarded Building of America Award for Southern California.

El Camino Hospital is awarded Building of America Award for Northern California and will be featured in Real Estate & Construction Review.

Children's Hospital Los Angeles project is highlighted at the Association of Children’s Hospitals and Related Institutions (NACHRI) Facilities Design conference and in Chicago at the Healthcare Facilities Symposium and Expo (HFSE)

Station Landing, the new headquarters for AAA Northern California, Nevada and Utah, achieved LEED Gold certification with 43 points from the U.S. Green Building Council.

Modern Healthcare Magazine ranks Rudolph and Sletten as the 4th Top General Contractor in the US for healthcare construction.

CMAA San Diego awards Francis Parker School Phase 6 with a Project Achievement Award, Honorable Mention in the Buildings/New Construction category.

California Construction, a McGraw Hill publication, ranked Rudolph and Sletten as the 8th Top Green Contractor in California

Rudolph and Sletten is named General Contractor of the Year by the American Subcontractor Association, Sacramento Region.

Rudolph and Sletten is awarded the 2010 Construction Employers’ Association (CEA) Excellence in Safety Award

University of California San Francisco Cardiovascular Research Building selected to present at Tradeline’s Academic Medical and Health Science centers Conference in Boston

 
<< Start < Prev 1 2 3 4 5 6 Next > End >>

Page 1 of 6